In September, 2005, construction began on SSWD's 5 million gallon (MG) storage tank
and pump station. SSWD has constructed an above ground welded steel 5 MG storage facility with
pumping station.
The pump station is capable of providing up to 10,000 gallons per minute (GPM)
of water through 5 turbine pumps. Supplies for the tank are treated surface water from the
City of Sacramento. Construction of the tank and pumping station was completed in November 2006.