This project was recommended in the 2009 Water System Master Plan capital needs analysis. It includes installing approximately 9,400 feet of new 12-inch diameter pipeline along Watt Avenue from Mountain Oak Way to Freedom Park Drive. A total of $700,000 is estimated for engineering design, environmental review and permitting with half of this cost to be expended in 2011 and half in 2012. A design consultant will be selected in 2011 to begin design work on this project.