The Parkland Estates Phase 1 Main Replacement Project consists of the installation of new water distribution main pipeline in public streets to replace existing backyard water mains that have outlived their useful life.

Major project facts:

  • 3,000 feet of 12-inch diameter pipe is to be installed.
  • 10 fire hydrants will be upgraded.
  • 12 new metered services will be installed; and 6 meters will be reconnected.
  • The construction cost is estimated to be $1.2 million.

Schedule:

  • The project is planned to start in November 2016 and be completed in the fall of 2017.
  • Final street restoration is planned to be completed by Sacramento County in the summer of 2018.

Parkland-Estates-Main-Replacement-Phase-1

 

Download the pdf version of the project area map.

Contact Information:

After-hours emergency calls should be directed to SSWD's main number 916.972.7171.

Construction Manager (primary contact)
     ERC Contracting (contractor for SSWD)
     Ricky (Richard) Ingraham
     Phone: 916.768.0786
     Email: erccontracting@yahoo.com

Field Inspector
     S. E. Ahlstrom Inspection (contractor for SSWD)
     Scott Ahlstrom
     Phone: 916.849.7159
     Email: seahlstrom@yahoo.com

Project Manager
     Sacramento Suburban Water District
     David Espinoza, P.E.
     Phone: 916.679.2886
     Email: despinoza@sswd.org