The project consists of the installation of new water distribution main pipeline in public streets to replace existing backyard water mains that have outlived their useful life.

Major project facts:

  • 28,053 feet of 6-, 8-, and 12-inch diameter pipe is to be installed.
  • 58 fire hydrants will be upgraded.
  • 532 new metered services will be installed; and 59 meters will be reconnected.
  • The construction cost is estimated to be $7 million.

Schedule:

  • The project began in February 2017 and is expected to be completed in the fall of 2018.
  • Work Phases Complete (see map below):     

Parkland Estates Main Replacement Phase 2 Phasing Map

Download the pdf version of the project area map

Main Replacement FAQs.

Contact Information:

After-hours emergency calls should be directed to SSWD's main number 916.972.7171.

Construction Manager (primary contact)
      ERC Contracting (contractor for SSWD)
      Ricky (Richard) Ingraham
      Phone: 916.768.0786
      Email: erccontracting@yahoo.com

Field Inspector
      S. E. Ahlstrom Inspection (contractor for SSWD)
      Scott Ahlstrom
      Phone: 916.849.7159
      Email: seahlstrom@yahoo.com

Project Manager
      Sacramento Suburban Water District
      David Espinoza, P.E.
      Phone: 916.679.2886
      Email: despinoza@sswd.org