Development Services

Print
Press Enter to show all options, press Tab go to next option

Development is performed by a developer/contractor at developer/owner expense.  The District will collect all related fees from the developer/owner, including meter cost(s).  The developer/contractor shall install the meter(s).

New water facilities within the District's service area shall comply with the following:

  1. District
    1. Regulations Governing Water Service;
    2. Improvement Standards and Technical Specifications; and
    3. Pipeline Separation Variance Waiver Process.
       
  2. State Water Resources Control Board's Division of Drinking Water (DDW)

To initiate a project, submit form(s) and required documents.  Incomplete information may result in rejection of the application.

Applications:

Supplementary Documents and Additional Information: 

Fees:

Meter Data Sheets:

Required Documents (by Contractor) Prior to Pre-Construction Meeting:

Regulations, Standards and Specifications:

The Engineering Department is available at 916.972.7171, Monday—Friday, 8:00 a.m.—4:30 p.m. or email newdevelopment@sswd.org.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer